| Packaging Details | metal pallet and plastic cover |
|---|---|
| Delivery Time | 40-50 days |
| Payment Terms | TT,LC,FOB,CIF |
| Supply Ability | Negociate |
| Place of Origin | wuxi -china |
| Packaging Details | Metal pallet |
|---|---|
| Delivery Time | 80-90 days |
| Payment Terms | Ex works/ FOB SHANGHAI/ CIF |
| Place of Origin | wuxi,china |
| Brand Name | CMC |
| Packaging Details | Metal pallet |
|---|---|
| Delivery Time | 80-90 days |
| Payment Terms | Ex works/ FOB SHANGHAI/ CIF |
| Place of Origin | wuxi,China |
| Brand Name | CMC |
| Single Unit Bending Force | 650 Ton, Total Tandem 1300 Ton |
|---|---|
| Single Worktable Effective Length | 7000mm, Total Linked Bending Length 14000mm |
| Control System Configuration | Imported Dual-Axis CNC Controller |
| Hydraulic Control Mode | Electro-hydraulic Proportional Synchronous System |
| Main Pump Motor Power Setup | 2×45kW Dual Pump Motor |
| Single Unit Bending Tonage | 400 Ton, Total Tandem 800 Ton |
|---|---|
| Single Worktable Processing Length | 7000mm, Total Linked Length 14000mm |
| Equipped CNC Controller Model | Delem DA53T (Netherlands) |
| Main Drive Motor Power Configuration | 2×30kW Dual Pump Motor |
| Applicable Processing Workpiece | Tapered / Octagonal Street Light Pole & High Mast Pole |
| Color | Blue |
|---|---|
| Application | Straighting |
| Packaging Details | Suitable for container shipping |
| Payment Terms | FOB/CIF |
| Supply Ability | 50-60 days |